A finished basement in Utah costs $35,000 to $165,000 with CCS, and most full basements land between $85,000 and $165,000. Your number depends on square footage, finish level, and how many bathrooms and bedrooms you add.
This guide covers what drives the price across Salt Lake and Utah County, from Draper and Herriman to Lehi and Saratoga Springs.
Want a range for your own basement? Try our cost calculator. It takes about two minutes.

What a CCS Basement Costs in 2026
Our published range is $35,000 to $165,000. Most full basement finishes land between $85,000 and $165,000, and we’ve built them well past $250,000.
| Finish level | What’s included | Typical rate |
|---|---|---|
| Basic | Carpet, painted drywall, standard trim, LED lighting | $45–$55 per sq ft |
| Mid-range | LVP, upgraded doors and trim, layered lighting, tile | $60–$75 per sq ft |
| Deluxe | Built-ins, feature walls, quartz, designer lighting | $100+ per sq ft |
| Add-on | Typical cost |
|---|---|
| Bathroom | $8,000–$18,000 |
| Kitchenette or wet bar | $6,000–$20,000 |
| Walkout entrance | $15,000–$45,000 |
| Quiet ceiling (sound dampening) | $3,000–$4,000 |
A ¾ bath with a tiled or cultured-marble shower and glass door usually costs more than a full bath with a one-piece tub/shower insert.
Some of our most expensive basements per square foot aren’t high-end at all. They’re older homes that need concrete cutting, new drain lines or floor leveling before finishing can start.
What Drives the Cost in Utah
Size and finish level set most of the price. These are the things that move it from there.
- Bathrooms. A bathroom is the biggest single add-on. If your basement floor has capped drain lines (rough-ins), it costs less. Without them, the concrete has to be cut and new drains run.
- Home age. Older homes in Sandy, Riverton, American Fork and parts of Draper and Alpine may need electrical panel upgrades, ceiling fixes or repairs to earlier unpermitted work before finishing can start.
- Bedrooms. Every basement bedroom needs a code-compliant egress window. If a room doesn’t have one, plan for it as a separate cost.
- Radon. Salt Lake and Utah County both have documented high radon levels. Test before you finish, and put in a mitigation system before the walls close if levels are 4.0 pCi/L or higher.
- Permits. Every city in our area requires permits for basement finishing. CCS pulls them under our license. Unpermitted work can cause problems at resale and with insurance.
Basement Finishing Costs by City
The price range is the same across our service area. What changes city to city is the type of home you’re likely starting with.
| City | What to know | Full guide |
|---|---|---|
| Draper | Mix of newer and older homes; older ones may need electrical upgrades | Draper cost guide |
| South Jordan | Mostly newer homes, many with rough-ins | South Jordan cost guide |
| Herriman | Mostly newer homes, many with rough-ins | Herriman cost guide |
| Riverton | More older homes; check for rough-ins and panel capacity | Riverton cost guide |
| Sandy | Wide range of home ages; hillside lots can need drainage work | Sandy cost guide |
| Bluffdale | Newer homes often have rough-ins; rental units are restricted in some areas | Bluffdale cost guide |
| Lehi | Mostly newer homes, many with rough-ins | Lehi cost guide |
| Saratoga Springs | Mostly newer homes, many with rough-ins | Saratoga Springs cost guide |
| American Fork | More older homes; check for rough-ins and electrical | American Fork cost guide |
| Alpine | Larger homes; some older sections | Alpine cost guide |
| Cedar Hills | Mostly newer homes, many with rough-ins | Cedar Hills cost guide |
Frequently Asked Questions
How much does it cost to finish a basement in Utah?
With CCS, $35,000 to $165,000 depending on size and finish level. Most full basements land between $85,000 and $165,000.
What does it cost per square foot?
About $45–$55 per sq ft for a basic finish, $60–$75 for mid-range and $100 and up for deluxe. Bathrooms, kitchenettes and walkouts add to that.
Is a ¾ bath cheaper than a full bath?
Usually not. A ¾ bath with a tiled or cultured-marble shower and glass door typically costs more than a full bath with a one-piece tub/shower insert.
Do I need a permit to finish my basement?
Yes. Every city in Salt Lake and Utah County requires one. CCS pulls all permits under our license.
Does my home have rough-in plumbing?
Look for capped pipes in the basement floor. Most homes built in the last 15 years have them. Older homes often don’t.
Should I test for radon first?
Yes. A test kit is cheap. If levels are high, install mitigation before the walls close.
Get a Real Number for Your Basement
The calculator gives you a range. An in-home estimate gives you a written number, with every allowance listed. Family-owned since 2014, with 300+ basements finished across Salt Lake and Utah County.
Or call (385) 233-6560.